Artifacts: System Lifecycle Management
No artifacts match the current filters.
Architecture Decision Record
System Lifecycle Management
ID: A011
A document capturing a significant architectural decision made during solution design, including context, options considered, decision rationale, and consequences. Produced by Solution Architecture as part of CSV lifecycle.
Source Documents (1)
Architecture Landscape Documentation
System Lifecycle Management
ID: A012
Documents the high-level design of the IT infrastructure architecture and its interdependencies with other components. Updated during delivery and after testing as needed.
Source Documents (1)
Processes (1)
Roles (1)
Archived Data Periodic Monitoring Procedure
System Lifecycle Management
ID: A013
A procedure or control document included in process R&R documentation that defines intervals and responsibilities for periodic review of archived data availability, integrity, and eventual deletion at end of the retention period.
Source Documents (1)
Processes (1)
Roles (2)
Backup Logs
System Lifecycle Management
ID: A019
Execution logs recording the completion and status of CS software, configuration, and operational data backups, reviewed periodically to ensure data availability and used to identify errors requiring incident reporting.
Source Documents (1)
Processes (1)
Roles (1)
CS Data Archival Plan
System Lifecycle Management
ID: A024
A plan defining the scope, approach, acceptance criteria, and access controls for archiving regulated data from a retired computerized system to a long-term repository. May be included within the CS Retirement Plan.
Source Documents (1)
Processes (1)
Roles (2)
CS Data Archival Report
System Lifecycle Management
ID: A025
An approved report summarizing the results of data archival activities, confirming data integrity, accessibility, and retrievability, and documenting any issues encountered. May be included within the CS Retirement Report.
Source Documents (1)
Processes (1)
Roles (1)
CS Decommissioning Plan
System Lifecycle Management
ID: A026
A plan defining activities for the controlled shutdown of a withdrawn computerized system, including account deactivation, agreement management, software license discontinuation, and hardware/software redeployment or disposal. May be included within the CS Retirement Plan.
Source Documents (1)
Processes (1)
Roles (1)
CS Decommissioning Report
System Lifecycle Management
ID: A027
An approved report summarizing decommissioning activities and results, identifying deviations from the approved plan and issues encountered during decommissioning. May be included within the CS Retirement Report.
Source Documents (1)
Processes (1)
Roles (2)
CS Retirement Plan
System Lifecycle Management
ID: A028
The comprehensive plan for retiring a computerized system, covering retirement strategy, scope definition, open items, retention requirements, and optionally encompassing withdrawal, data archival, and decommissioning sub-plans. Approved by Process Owner and QA unit.
Source Documents (1)
Processes (1)
Roles (1)
CS Withdrawal Plan
System Lifecycle Management
ID: A029
A plan defining activities for removing a computerized system from active end-user operations, covering permission changes, SLA continuity, interface disabling, stakeholder communication, and periodic review requirements during withdrawal. May be included within the CS Retirement Plan.
Source Documents (1)
Processes (1)
Roles (1)
CS Withdrawal Report
System Lifecycle Management
ID: A030
An approved report summarizing the results of CS withdrawal execution, identifying deviations from the original withdrawal plan and any remaining unresolved issues. May be included within the CS Retirement Report.
Source Documents (1)
Processes (1)
Roles (2)
Computerised Systems Inventory
System Lifecycle Management
ID: A037
A CSV artifact owned by the CSV Process Owner that maintains a current inventory of all validated computerized systems, their validation status, and key lifecycle dates to support ongoing compliance monitoring.
Source Documents (5)
Processes (4)
Configuration Specification
System Lifecycle Management
ID: A042
Documents system configuration settings in SOLMAN as Configuration Guide. Created by Solution Architect, reviewed by Validation Lead, approved by Business Analyst. Exceptions: CSV review not required for MDG CG (Data Models), Authorization CG, and Soft-Configuration.
Configuration Specifications
System Lifecycle Management
ID: A043
Documents software configuration settings to meet requirements and specifications, associated with specific software or system versions. Includes infrastructure configuration settings and vendor-specific customer configurations.
Source Documents (1)
Processes (1)
Roles (1)
Control Test
System Lifecycle Management
ID: A048
A ServiceNow IRM object created automatically when the Engagement advances to Fieldwork, representing a specific control to be evaluated. Contains Design Test and Operation Test sub-tests with result justifications and an Effectiveness determination. Defined in WI-0300929.
Source Documents (1)
Roles (1)
Data Archival Plan
System Lifecycle Management
ID: A050
Documents how infrastructure-related data, audit trails, and IaC qualified code (including previous versions) are archived according to applicable retention periods during retirement.
Source Documents (1)
Processes (1)
Roles (1)
Data Archival Report
System Lifecycle Management
ID: A051
Summarizes executed data archival activities including verification that archived data and code are accessible and properly maintained in the long-term repository.
Source Documents (1)
Processes (1)
Roles (1)
Data Certification Task
System Lifecycle Management
ID: A052
A ServiceNow task generated by an active certification schedule that prompts the certifier to periodically review and formally attest to the accuracy of Business Application compliance data.
Source Documents (1)
Processes (1)
Data Migration Plan
System Lifecycle Management
ID: A056
Documents how IaC qualified code packages are migrated to a target system, including migration procedures and testing approach to verify the package works as expected at the target.
Data Migration Report
System Lifecycle Management
ID: A057
Summarizes executed IaC code and documentation migration activities including verification results. Approved after successful migration and testing at the target system.
Decommissioning Plan
System Lifecycle Management
ID: A059
Documents the procedure for shutting down an IT infrastructure platform in a controlled manner, including configuration management system updates and change management steps.
Source Documents (1)
Processes (1)
Roles (1)
Decommissioning Report
System Lifecycle Management
ID: A060
Summarizes executed decommissioning activities for an IT infrastructure platform, confirming proper shutdown and configuration management system updates.
Source Documents (1)
Processes (1)
Roles (1)
Defect
System Lifecycle Management
ID: A061
Records system defects identified during test execution in SOLMAN. For GxP and ICFR relevant systems, all defects are reviewed by Validation Lead before the Test Plan is set to Completed. Lifecycle: New→In progress→Solution Proposal→Confirmed with parallel Defect Correction objects.
Defect Record
System Lifecycle Management
ID: A062
A tracked record of a defect identified during testing or operations, capturing its origin, severity, status, and resolution, including association with related requirements and problems.
Source Documents (1)
Design Specification (DS)
System Lifecycle Management
ID: A063
Documents technical design for the computerized system in SOLMAN as DS Documents. Created by Developer with Developer Lead 4-eyes principle. Reviewed and approved by Validation Lead. Lifecycle: Draft→Ready for Review→Ready for Approval→Approved.
Source Documents (1)
Roles (2)
Design Specifications
System Lifecycle Management
ID: A064
Technical implementation details for each functional component including relationships between components, hardware and software design, and integration criteria. Required for internal development, COTS customization, and specific configurations.
Source Documents (1)
Processes (1)
Roles (1)
Disaster Recovery Plan
System Lifecycle Management
ID: A068
Plan defining recovery procedures and testing schedules for restoring a computerized system following a major disaster event, including roles of external vendors and contracts defining their participation.
Source Documents (1)
ERES Requirements Specification
System Lifecycle Management
ID: A070
A standardized set of harmonized, S.M.A.R.T. functional and non-functional requirements ensuring a computerized system complies with FDA 21 CFR Part 11 and EU GMP Annex 11. Requirements are copied directly into the system Requirements Specifications or User Stories.
Source Documents (1)
Electronic Records Inventory
System Lifecycle Management
ID: A071
A formal inventory documenting all GxP-relevant Electronic Records created, modified, maintained, archived, retrieved, or transmitted by a computerized system. Produced during the define stage of the implementation phase and included in the Technical Assessment.
Source Documents (1)
Electronic Signatures Inventory
System Lifecycle Management
ID: A072
A formal inventory documenting all Electronic Signatures required by GxP processes, each linked to the specific Electronic Record it covers. Produced alongside the ER Inventory during the define stage of system implementation.
Source Documents (1)
Functional Specification (FS)
System Lifecycle Management
ID: A078
Documents functional design of the computerized system in SOLMAN as FS Documents. Created by Solution Architect, reviewed by Validation Lead, and approved by Business Analyst. Lifecycle: Draft→Ready for Review→Ready for Approval→Approved.
Functional Specifications
System Lifecycle Management
ID: A079
Describes the functions the computerized system must have to satisfy requirements, including business process functions, data handling, and security controls. Must be verifiable and traceable to requirements.
Source Documents (1)
Processes (1)
Roles (1)
GxP Computerized Systems Inventory
System Lifecycle Management
ID: A082
Comprehensive and up-to-date inventory of all PD GxP computerised systems owned and maintained by the Contract Acceptor (RDT), managed in the RDT Configuration Management Application. Contract Giver must have adequate access to facilitate oversight responsibilities. System Owner, Process Owner, and
IT Compliance Issue
System Lifecycle Management
ID: A085
A ServiceNow IRM object automatically created for each Control Test where at least one sub-test is Ineffective. Represents an IT Deviation requiring corrective action and is managed according to the RDT Deviation and CAPA Management process (WI-0303360). Referenced in WI-0300929.
Source Documents (1)
Roles (1)
Infrastructure Qualification Documentation
System Lifecycle Management
ID: A091
Documents the qualification of underlying hardware and infrastructure components for development, test, and production environments following approved qualification procedures.
Source Documents (1)
Processes (1)
Roles (1)
Installation Verification Protocol
System Lifecycle Management
ID: A094
Details the installation, configuration, and operational checks for IT infrastructure platform qualification through manual delivery. Verifies completion and confirmation of configuration and installation.
Source Documents (1)
Processes (1)
Local Inventory
System Lifecycle Management
ID: A100
A ServiceNow APM localization record linked to a parent Business Application, representing a scope-specific instance of the Computerised System with dedicated local ownership and QA oversight assignments.
Source Documents (1)
Operational Support Plan
System Lifecycle Management
ID: A106
Documents maintenance support activities, procedures, and support organization required to maintain the IT infrastructure platform. Includes vendor SLAs when external vendors provide ongoing support.
Source Documents (1)
Processes (1)
Roles (1)
Performance Monitoring Records and Reports
System Lifecycle Management
ID: A110
Records and reports documenting monitoring of CS performance, availability, and supporting infrastructure metrics, including SLA fulfillment reporting from service suppliers.
Source Documents (1)
Periodic Review Engagement
System Lifecycle Management
ID: A111
The central ServiceNow IRM object used to manage and document a Periodic Review of a GxP Computerised System. Automatically created 90 days before the next review initiation date and progresses through states: Validate and Plan, Fieldwork, Awaiting Approval, Follow Up, and Closed. Defined in WI-0300
Periodic Review Form/Report Template
System Lifecycle Management
ID: A112
A CSV artifact owned by the CSV Process Owner providing a structured template for conducting and formally documenting periodic reviews of validated computerized systems to confirm continued compliance.
Source Documents (1)
Periodic Review PDF Report
System Lifecycle Management
ID: A113
A PDF report showing the full contents of an approved Periodic Review Engagement. Can be generated ad-hoc via the 'Generate PDF' button when the Engagement is in Follow-up state, or is automatically generated and attached when the Engagement is closed. Defined in WI-0300929 Section 5.2.
Periodic Review Report
System Lifecycle Management
ID: A114
A formal report created by the System Owner and approved by the Process Owner and Quality Assurance that documents the results of a CSV Periodic Review, confirming whether the computerized system or IT Infrastructure platform has been maintained in a validated or qualified state or identifying requi
Source Documents (3)
Periodic Review Schedule
System Lifecycle Management
ID: A115
A schedule maintained by Quality Assurance tracking Periodic Review Initiation Dates and Due Dates for all GxP validated computerized systems and IT Infrastructure platforms, with review intervals determined by regulatory impact classification.
Source Documents (1)
Processes (1)
Product Increment
System Lifecycle Management
ID: A122
The sum of all Product Backlog items completed during one or more sprints, presented to stakeholders at sprint end as defined in SRD-0145688. Considered complete only when the Definition of Done for the Product Increment is fully achieved. Could potentially be released for business use.
Source Documents (1)
Processes (1)
Product Roadmap
System Lifecycle Management
ID: A123
High-level plan of how a GxP product will evolve over time, developed in consultation with Business, IT, and Quality Stakeholders and maintained on a regular basis as defined in SRD-0145688. Contains both short-term and long-term views of future product functionality and when new features will be re
Source Documents (1)
Qualification Plan
System Lifecycle Management
ID: A124
Documents the scope, roles and responsibilities, strategy, prerequisites, activity sequencing, and acceptance criteria for IT infrastructure platform qualification efforts. Addresses SRA and data classification outcomes.
Source Documents (1)
Processes (1)
Qualification Protocol
System Lifecycle Management
ID: A125
Details the installation, configuration, and operational checks for IT infrastructure component or solution qualification through manual delivery. May embed detailed requirements for individual components/solutions.
Source Documents (1)
Processes (1)
Qualification Registry
System Lifecycle Management
ID: A126
Identifies all lifecycle documentation and maintenance procedures that support the qualified status of the IT infrastructure platform. Can be part of the Qualification Summary Report or an independent document.
Source Documents (1)
Processes (1)
Qualification Summary Report
System Lifecycle Management
ID: A127
Summarizes the results of all IT infrastructure platform qualification activities and associated documentation. Includes a clear statement that the platform is qualified as per original intended use.
Source Documents (1)
Processes (1)
Requirements Specifications
System Lifecycle Management
ID: A137
Documents the intended use of the computerized system and all requirements including business process, regulatory, security, data integrity, and technical requirements. Each requirement must be uniquely identified and meet SMART criteria.
Source Documents (1)
Processes (1)
Roles (2)
SAT/UAT Test Case
System Lifecycle Management
ID: A143
Test Script in SOLMAN documenting individual test cases for System Acceptance Testing or User Acceptance Testing. Created and approved by Test Engineer with 4-eyes principle. Reviewed by Validation Lead by sampling during Work Package review.
Sprint Backlog
System Lifecycle Management
ID: A147
Subset of the Product Backlog selected for execution during a specific sprint as defined in SRD-0145688. Defines the tasks to be completed to deliver the user stories planned for the sprint and is managed within IT Tools.
Source Documents (1)
Processes (1)
System Description
System Lifecycle Management
ID: A151
A current documentation artifact required by SRD-0139481 for each GxP computerized system, detailing system components and interfaces to identify data flows between systems and processes. This document must be kept current and forms part of the system's validated state documentation.
Source Documents (2)
Processes (1)
Roles (1)
System Lifecycle Document
System Lifecycle Management
ID: A152
Document created as an outcome of implementation, maintenance, or retirement activities of a system that resides with the system throughout its full lifecycle. Classified as Dynamic (kept current, e.g., IV protocol, System Specifications, OSP, Test Cases) or Static/Historical (point-in-time, e.g., V
Source Documents (2)
System Retirement Plan
System Lifecycle Management
ID: A153
Planning document governing the retirement of a computerised system. May incorporate the retirement risk assessment if not documented separately; must be approved only after the retirement risk assessment is complete.
Source Documents (1)
Processes (1)
Roles (1)
Technical Requirement Specification
System Lifecycle Management
ID: A157
Defines the specific technical needs and behavior for an IT infrastructure component, solution, or platform including installation, configuration, operational, regulatory, and security requirements.
Source Documents (1)
Processes (1)
Roles (1)
Test Case
System Lifecycle Management
ID: A158
A predefined test artifact containing test inputs, execution conditions, and expected results developed to verify compliance with specific computerised system requirements, requiring 4-eyes approval before execution.
Source Documents (1)
Test Cases
System Lifecycle Management
ID: A159
Structured test scenarios defining inputs, execution conditions, and expected results to validate that a computerized system meets its specifications and regulatory requirements.
Source Documents (1)
Test Plan
System Lifecycle Management
ID: A160
Documents the test approach, scope, and test cases for SAT/UAT in SOLMAN. Managed through two phases: pre-execution (Created→Ready for Approval→Approved for Execution→Released for Execution) and post-execution (Released for Execution→Completed, confirmed by Process Owner).
Test Plan and Strategy
System Lifecycle Management
ID: A161
Defines the test scope, prerequisites, test strategy, acceptance criteria, and defect handling approach for IT infrastructure platform qualification testing.
Source Documents (1)
Processes (1)
Test Record
System Lifecycle Management
ID: A162
A record generated during test execution providing documented evidence that testing activities were performed to verify a computerised system requirement or functionality, requiring 4-eyes approval.
Test Results
System Lifecycle Management
ID: A163
Documented outcomes of executed test cases, capturing actual results against expected results, defects identified, and overall test execution status for GxP-regulated system validation.
Source Documents (1)
Test Script Execution (Test Run)
System Lifecycle Management
ID: A164
Records the execution of SAT/UAT Test Cases in SOLMAN. Test Coordinator/Engineer creates, executes, and closes the test run. Validation Lead reviews by sampling before approving Test Plans as Completed.
Test Strategy
System Lifecycle Management
ID: A165
A document defining how testing will ensure requirements and specifications of a computerised system are met, established before starting testing activities, and approved by QA for GxP systems.
Source Documents (2)
Processes (3)
Test Summary Report
System Lifecycle Management
ID: A166
A report created at the end of the acceptance testing phase providing a consolidated view of performed test and verification activities to demonstrate suitability for releasing the computerised system.
Testing Summary Report
System Lifecycle Management
ID: A167
Summarizes all test results, deviations, and defects from IT infrastructure platform qualification testing. Includes a statement on whether overall acceptance criteria from the Test Plan have been met.
Source Documents (1)
Processes (1)
Traceability Matrix
System Lifecycle Management
ID: A168
Automatically maintained in SOLMAN, providing end-to-end traceability from requirements through test cases and execution. Used by Validation Lead during Work Package verification to confirm requirement coverage and approval completeness.
User Requirements Specification (URS)
System Lifecycle Management
ID: A175
Defines user and regulatory requirements for a computerized system, managed in SOLMAN as a URS Document. Includes GxP ER/ES and audit trail requirements for regulatory systems. Lifecycle: Draft→Ready for Review→Ready for Approval→Approved.
User/Functional Requirements
System Lifecycle Management
ID: A176
Documentation of stakeholder needs and functional requirements for an Informatics solution, supporting both waterfall and agile development methodologies in line with CSV procedures.
Source Documents (1)
Validation Plan
System Lifecycle Management
ID: A177
A CSV framework template and project deliverable that defines the validation approach, scope, roles, and testing strategy for a computerized system implementation project. Jointly owned with PMM process owners.
Validation Report
System Lifecycle Management
ID: A178
A CSV artifact owned by the CSV Process Owner that documents the results of all validation activities and provides formal evidence that a computerized system meets its intended use and regulatory requirements.
Validation Summary Report
System Lifecycle Management
ID: A179
Summarizes all validation activities and associated documentation. Includes high-level test results, deviations, outstanding defects, residual risks with mitigation recommendations, and a clear statement of system acceptability. May be titled Assurance Report or Release Summary.
Source Documents (1)
Processes (1)
Work Package (WP)
System Lifecycle Management
ID: A181
SOLMAN Work Package grouping related deliverables and changes for a release. For GxP and ICFR relevant systems, Validation Lead verifies requirement coverage, approvals, traceability, and ASPIRE SolMan methodology adherence, then sets 'CSV review status' to 'Verified' before handover to Release.
Source Documents (1)
Roles (1)